Brenda Allen, Director

Facilities Administration Building
13300 Old Marlboro Pike
Upper Marlboro, MD 20772
301 952-6560 (VOICE)
301 952-6605 (FAX)

Solicitations and Awards
TypeNumberTitleOriginatorDate PostedOpening DateBuyer
IFB002-15Cancellation Notice for Grounds Keeping and Carpentry ToolsBuilding ServicesMarch 13, 2015March 13, 2015
RFP017-15Multi-media Archiving for Principal & Teacher Leadership(Addendum)Talent DevelopmentNovember 12, 2014December 17, 2014C. Atchison
IFB026-15Notice of Cancellation Media Dome SystemScienceFebruary 20, 2015 , N. Hector
IFB031-15031-15 Underground Storage Tanks (click to see Addendum )Transportation February 25, 2015April 10, 2015N.Hector
IFB032-15Medical Monitoring Services for PGCPS (Click to see Addendum)SafetyMarch 24, 2015April 8, 2015N. Hector
IFB045-15Provide D.O.T Physical Examinations of Current Commercial Drivers License Holders for Board of Education Employees (click to see addendum)Transportation April 24, 2015May 22, 2015N Hector
IFB052-15Stage Curtains (click to see add)Maintenance May 5, 2015June 3, 2015N Hector
IFB059-14Barbering and Cosmetology Classroom Reno at Bladensburg HS (Click to see Addendum)CIPDecember 13, 2013January 17, 2014J. Smarr
IFB130-14Crossland HS Sound System Notice of CancellationCIPJune 30, 2014June 30, 2014N. Hector
RFP049-15Consulting Services for Oracle E Business Suite IT April 23, 2015May 22, 2015K Johnson
RFP056-14Data Center In-Row Cooling System - Notice of CancellationITMay 1, 2015 , Cathy Atchison
IFB054-15Frederick Douglass & Suitland HS Track & Tennis CourtsCIPMay 18, 2015June 8, 2015Cathy Atchison
IFB013-15Furnish and Deliver Compressor Parts - Cancellation NoticeMaintenanceApril 23, 2015 , Cathy Atchinson
IFB004-14Health Supplies - Notice of CancellationHealth department June 23, 2014 , Angela Byrd
IFB046-15Employee Testing (click to see add)Transportation April 27, 2015May 26, 2015N Hector
RFP060-15JOC Mechanical Contractors Building ServicesMay 22, 2015June 25, 2015Cathy Atchison
RFINotice of Auction AssetsPurchasingFebruary 4, 2014February 17, 2014B. Allen
RFP016-14Oracle Hyperion Plublic Sector Planning & Budgeting Cancelation Information TechnologySeptember 24, 2013 , D. Young
RFP015-14Pre-Qualification of Mechanical Contractors for Various Jobs @ PGCPS -Notice of Cancellation CIPFebruary 6, 2014 , Johnna Smarr
RFP038-15Photography and Yearbooks ES, MS, HS(click to see addendum)Administration April 28, 2015May 4, 2015N Hector
TypeNumberTitleStart DateExpiration DateVendorAmount
RFP016-15Enhancing Teacher and Leader Capacity Research Program May 1, 2015June 30, 2017Educational Information & Resource $199,850
IFB107-14Bond Mill ES Univent ReplacementApril 17, 2015April 15, 2016Adrian L. Merton $722,342.14
IFB110-14Samuel Ogle MS Univent ReplacementApril 17, 2015April 15, 2016Adrian L. Merton $1,346,661.88
IFB027-15027-15 Kettering Middle School ADA Improvements March 4, 2015March 4, 2016Protec Construction Inc. $NaN
IFB028-15Bowie HS ADA Improvements March 4, 2015March 4, 2016Tito Contractors Inc. $NaN
IFB025-15Plagarism SoftwareFebruary 18, 2015June 30, 2016iParadigm LLC $308,543.52
RFP133-14 On Call HVAC Services Contractors February 1, 2015June 30, 2015EMCOR $58,370
IFB123-14Oracle Primavera Cloud Mgt SvcsJanuary 16, 2015January 1, 2016GAEA Global Technologies $158,396
IFB136-14Chapel Forge ECC Parking LotDecember 23, 2014December 20, 2015Nastos Construction $611,700
RFP129-14Finance Buses, Vehicles, Textbooks and ComputersNovember 21, 2014November 20, 2015Grant Capital $35,366,026
IFB011-15Furnish and Deliver Locks and AccessoriesNovember 15, 2014November 14, 2017Taylor Security & Locks inc $5,297
IFB011-15Furnish and Deliver Locks and AccessoriesNovember 15, 2014November 14, 2017Accredited Lock Supply Co $47,780.25
IFB011-15Furnish and Deliver Locks and AccessoriesNovember 15, 2014November 14, 2017Independent Hardware Inc $44,125.01
IFB005-15Installation of Bituminous Concrete in New Specified LocationsNovember 1, 2014October 31, 2015Espina Paving, Inc $185,380
IFB005-15Installation of Bituminous Concrete in New Specified Locations and Removal and Replacement of Bituminous Concrete in Existing Specified Locations within Prince Georges County Public School District November 1, 2014October 31, 2017American Tennins Courts, Inc. $NaN
IFB005-15Installation of Bituminous Concrete in New Specified Locations and Removal and Replacement of Bituminous Concrete in Existing Specified Locations within Prince Georges County Public School District November 1, 2014October 31, 2017Espina Paving, Inc. $NaN
IFB005-15Installation of Bituminous Concrete in New Specified LNovember 1, 2014October 31, 2015Bardon Inc. dba Aggegate $171,250
RFP137-14Master Plan Support October 23, 2014November 1, 2015Brailsford and Dunlavey $1,474,166
IFB006-15Existing and New MDM Software Maintenance October 1, 2014September 30, 2017CDW Government, LLC $136,980
IFB113-14Fresh ProduceOctober 1, 2014September 30, 2015Bowie Produce $1,323,435
RFP115-14Password Complexity October 1, 2014September 30, 2015Anixis $NaN
IFB126-14Ala Carte Food Products and BeveragesOctober 1, 2014September 30, 2015Eastern Food Services $111,551.75
IFB138-14Energy Performance Contract Final PhaseOctober 1, 2014November 30, 2015Pepco Energy Services IncEnergy Performance Contract Final PhaseO $3,958,534
IFB114-14114-14 Dry Foods October 1, 2014September 30, 2015Eastern Food Services Inc, $NaN
IFB118-14118-14 Frozen Foods October 1, 2014September 30, 2015Eastern Food Services Inc, $NaN
IFB131-14Inspect, Repair & Maintain Elevators and LiftsSeptember 1, 2014August 31, 2017United Elevator $NaN
IFB131-14 Inspect, Repair & Maintain Elevators and LiftsSeptember 1, 2014August 31, 2017GC Jones Elevator Company $NaN
IFB131-14Inspect, Repair & Maintain Elevators and LiftsSeptember 1, 2014August 31, 2017Otis Elevator $NaN
RFQ91847Turf Field Projects at Gwynn Park & Dr. Henry Wise HSJuly 2, 2014August 1, 2015Astro Turf, LLC $3,218,969
RFP001-14University Partnership for Admin DevelopmentJuly 1, 2014June 30, 2015University of Maryland $199,869
RFP058-14Speech and Language Therapy for Private and Religious -July 1, 2014June 30, 2017Cobb Pediatric Speech Services $95,000
RFP144-14Registered Nursing ServicesJuly 1, 2014June 30, 2015Arbor E&T LLC $75,000
RFP144-14Registered Nursing ServiceJuly 1, 2014June 30, 2015Access Nursing Services of MD $115,000
RFP144-14Registered Nursing ServiceJuly 1, 2014June 30, 2015Home Health Connection $135,000
RFP144-14Registered Nursing ServiceJuly 1, 2014June 30, 2015Chesapeake Home Health Care $26,000
RFP144-14Registered Nursing ServiceJuly 1, 2014June 30, 2015Nursing & Health Services Training $40,000
RFP144-14Registered Nursing ServicesJuly 1, 2014June 30, 2015JemiSun HealthCare Services $50,000
RFP144-14Registered Nursing ServicesJuly 1, 2014June 30, 2015DH Porter dba Staffing $250,000
RFP121-14Before and Aftercare Service July 1, 2014July 31, 2017AlphaBEST Educational Inc $NaN
RFP121-14Before and Aftercare Services July 1, 2014July 31, 2017YMCA of Metropolitan Washington $NaN
IFB071-14Diary Products July 1, 2014June 30, 2017Cloverland Farms Dairy $6,128,062.81
RFQ91848Feasibility Study for William Wirt MSJuly 1, 2014June 30, 2015Grimm & Parker Architects $38,750
IFB063-14Furnish, Deliver & Install Carpet Carpet Tile & Resilient Flooring July 1, 2014June 30, 2017Fitz Flooring LLC $200,000
IFB063-14Furnish, Deliver & Install Carpet, Carpet Tile & Resilient FlooringJuly 1, 2014June 30, 2017B&B Floor Services LLC $200,000
IFB063-14Furnish, Deliver & Install Carpet, Carpet Tile & Resilient FlooringJuly 1, 2014June 30, 2017L&R Enterprises T/A L&R Floors $200,000
IFB067-14Furnishing and Delivering Electrical Materials and PartsJuly 1, 2014June 30, 2015Graybar Electric $41,302.75
RFP027-14General Banking Services July 1, 2014June 30, 2017Suntrust Banks $355,405.5
IFB117-14William Schmidt Center UpgradesJune 12, 2014October 1, 2015Global Builders $457,000
RFP053-13Data Ctr Maintenance & IT Support Services June 12, 2014May 31, 2015Daly Computers $3,100,000
RFP010-14Unemployment Cost Control Mgmt SvcsJune 1, 2014May 31, 2015Equifax Workforce Solution $91,500
RFP053-13Data Ctr Maintenance & IT Support ServicesJune 1, 2014May 31, 2015CAS Severn, Inc $2,900,000
IFB076-14Kenilworth ES Building Interior RenovationMay 28, 2014September 1, 2015CDCI Inc $126,250
IFB078-14Mt. Ranier ES Window ReplacementMay 28, 2014September 1, 2015CDCI Inc $108,000
IFB079-14Gwyn Park MS HVAC Chilled WaterMay 28, 2014September 1, 2015CDCI Inc $16,670
IFB093-14Rockledge ES Exterior Door ReplacementMay 28, 2014September 1, 2015CDCI, Inc. $376,460
IFB094-14 HW Wheatley Exterior Door ReplacementMay 28, 2014September 1, 2015CDCI, Inc. $466,989
IFB095-14Paint Branch ES Exterior Door ReplacementMay 28, 2014September 1, 2015CDCI, Inc $504,478
IFB102-14Baden ES Exterior Door ReplacementMay 28, 2014September 1, 2015CDCI, Inc. $292,636
IFB105-14James Harrison ES Exterior Door ReplacementMay 28, 2014September 1, 2015CDCI, Inc. $543,668
IFB111-14Gwynn Park HS Culinary Arts Classroom RenovationMay 28, 2014September 1, 2015HITT Contracting $1,327,891
IFB054-14Waldon Woods ES Pod RenovationsMay 27, 2014May 26, 2015Island Contracting $20,004,622
IFB083-14 Beltsville Academy Window Tech ReplacementMay 27, 2014September 1, 2015Hitt Contracting $1,842,655
IFB091-14Duval HS Tech Fab Panel ReplacementMay 27, 2014September 1, 2015Hitt Contracting $893,985.15
IFB097-14Duval HS Culinary Arts Classroom RenovationMay 27, 2014September 1, 2015HITT Contracting $1,181,228
IFB096-14Crossland HS Ceiling-Lighting ReplacementMay 23, 2014September 1, 2015F. H. Paschen $893,004.25
IFB104-14Samuel Chase ES Roof ReplacementMay 23, 2014May 22, 2015RJ Crowler $1,384,373.39
RFQ91841Feasibility Study for High Point HSMay 23, 2014September 1, 2015SHW Group $75,000
IFB075-14 Beacon Heights ES Boiler ReplacementMay 22, 2014September 1, 2015Adrian Merton $808,212.03
IFB077-14 Hyattsville MS Cooling Tower ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $124,595.57
IFB084-14Crossland HS Air Handling ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $3,600,718.88
IFB085-14CT Reed ES Unit Ventilator ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $1,235,513.31
IFB086-14High Point HS Boiler ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $1,844,321.83
IFB087-14Flintstone ES Unit Ventilator ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $918,786.07
IFB090-14Largo HS Reinsulate Chill Water PipeMay 22, 2014September 1, 2015Adrian L. Merton $363,559
IFB092-14Beltsville Academy Piping ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $1,700,760.7
IFB100-14Fort Foote ES Piping ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $1,522,329.01
IFB100-14Gaywood ES Piping ReplacementMay 22, 2014September 1, 2015Adrian L. Merton $1,163,240.76
IFB101-14Rose Valley ES Exterior Door ReplacementMay 22, 2014September 1, 2015CDCI, Inc $386,934
IFB108-14High Point HS Unit ReplacementMay 22, 2014October 1, 2015Adrian L. Merton $3,548,079.94
IFB098-14Frank Dent ES Pod ConversionMay 22, 2014April 30, 2015Centennial Contractors Enterprises, Inc $2,099,957
RFP005-14Job Ording Contracting Services May 20, 2014April 30, 2017Adrian L. Merton $2,500,000
IFB073-14Batting Cages at Various PGCPS HSMay 1, 2014April 30, 2015MCA Construction $397,320
IFB088-14Columbia Park ES Unit VentilatorMay 1, 2014April 30, 2015The Matthews Group, Inc $685,565.12
RFQ91833CT Reed ES Pipe and Ceiling ReplacementMay 1, 2014September 1, 2015Cain Contracting $250,326
IFB099-14ArrowHead ES Condensate Piping ReplacementMay 1, 2014April 30, 2015Adrian L. Merton, Inc. $796,884.47
IFB103-14Buck Lodge ES Roof ReplacementMay 1, 2014April 30, 2015 R.J. Crowley, Inc $3,693,485.45
IFB006-14CT Reed Pod Coversion ProjectMay 1, 2014April 30, 2015Tuckman Barbee Construction Co, Inc $1,574,800
IFB070-14 Deerfield Run ES Open Pod ConversionMay 1, 2014April 30, 2015Tito Contractors, Inc $2,843,800
IFB099-14Edgar A. Poe ES Condensate Piping ReplacementMay 1, 2014April 30, 2015Adrian L Merton, Inc. $648,896.75
IFB050-14Eleanor Roosevelt HS Air Handling Units ReplacementMay 1, 2014April 30, 2015Hot & Cold Corp $3,986,139
IFB067-14Electrical Materials and PartsMay 1, 2014April 30, 2015Maurice Electric Supply $2,697.55
IFB067-14Electrical Materials and PartsMay 1, 2014April 30, 2015United Electric Supply $138,063.38
IFB067-14Furnishing & Delivering Electrical Materials and PartsMay 1, 2014June 30, 2015Shepherd Electric Supply $36,587.45
IFB109-14Glassmanor ES Roof ReplacmentMay 1, 2014April 30, 2015R.J. Crowley, Inc $942,543.75
RFP005-14Job Order Contracting SevicesMay 1, 2014April 30, 2017CDCI, Inc $2,500,000
RFP005-14Job Order Contracting ServicesMay 1, 2014April 30, 2015EGMS/Beltsville Industies Group Inc Joint Venture $2,500,000
RFP005-14Job Order Contracting ServicesMay 1, 2014April 30, 2015Global Builders, LLC $2,500,000
RFP005-14Job Order Contracting ServicesMay 1, 2014April 30, 2015JLN Construction Service, Inc $2,500,000
RFP005-14Job Order Contracting ServicesMay 1, 2014April 30, 2015F& L Constructions, Inc $2,500,000
RFQ005-14Job Order Contracting Services - Notice of Award May 1, 2014April 30, 2017F.H. Paschen, SNN $2,500,000
RFP005-14Job Ording Contracting Services May 1, 2014April 30, 2017Paige Industrial Services, Inc $2,500,000
RFP005-14Job Ording Contracting Services May 1, 2014April 30, 2017Kellogg Brown & Root Services $2,500,000
RFP005-14Job Ording Contracting Services May 1, 2014April 30, 2017Desbuild, Inc $2,500,000
RFP005-14Job Ording Contracting Services May 1, 2014April 30, 2017Tito Contractors, Inc $2,500,000
RFP005-14Job Ording Contracting Services May 1, 2014April 30, 2017Montage, Inc $2,500,000
IFB106-14Sidewalk & Pathway at Greenbelt MSApril 30, 2014September 1, 2015CDCI, Inc. $117,962
RFP053-14Fundamental and Enhanced Comm Svcs for Various PGCPS April 7, 2014March 7, 2015Reynolds Consulting Engineers, Inc $200,000
RFP053-14Fundamental & Enhanced Comm Svcs for Various PGCPS April 3, 2014March 3, 2015Advanced Building Performanc, Inc $200,000
RFP053-13Data Ctr Maintenance & IT Support Services (Click to See Award Amendment No.1April 1, 2014April 1, 2017DataNetworks $350,000
RFP069-14Educational Learning Systems @ PGCPSApril 1, 2014March 31, 2015Compass Learning $427,567.5
RFP053-14Fundamental & Commissioning Svcs for Various PGCPS Projects April 1, 2014March 31, 2015Brinjac Engineering, Inc $200,000
RFP053-14Fundamental and Enhanced Comm Svcs for Various PGCPS April 1, 2014March 1, 2015Horizon Engineering Associates $200,000
RFQ91837Installation of New Incline Lift at Carrollton ESApril 1, 2014March 31, 2015Goel Services, Inc $31,875
IFB007-14Kettering ES Pod RenovationMarch 14, 2014March 13, 2015CDCI Inc. $1,716,451
IFB045-14Design Build Svcs for Bowie HS Fire Alarm ReplacementMarch 12, 2014March 11, 2015Alarm Tech $330,810
IFB046-14 Design Build Svcs for Fire Alarm Replacement at High Point HSMarch 12, 2014March 11, 2015Alarm Tech $358,410
IFB047-14Design Build Svcs Fire Alarm Replacement at Laurel HSMarch 12, 2014March 11, 2015Alarm Tech $316,240
IFB029-14Buck Lodge MS Chiller ReplacementFebruary 25, 2014March 1, 2015RSC Electrical & Mechanical Contractors $238,000
IFB040-14Carole Highlands ICE Storage Unit Replacement - Notice of Contract AwardFebruary 25, 2014March 1, 2015RSC Electrical & Mechanical Contractors, Inc $219,000
IFB036-14Chapel Forge ECC Boiler ReplacementFebruary 25, 2014March 1, 2015RSC Electrical & Mechanical Contractors Inc $258,000
IFB026-14Bond Mill Pod ConversionFebruary 21, 2014February 20, 2015Tito Contractors $993,887.51
IFB033-14Rockledge ES Boiler ReplacementFebruary 21, 2014February 20, 2015Hurley Company $230,900
IFB034-14Bond Mill Boiler ReplacementFebruary 21, 2014February 20, 2015Hot Cold Corporation $370,450
IFB035-14Frances Fuchs Boiler ReplacementFebruary 21, 2014February 20, 2015Hot Cold Corporation $254,650
IFB037-14Apple Grove ES Unit Ventilator ReplacementFebruary 21, 2014February 20, 2015RSC Electrical and Mechanical $903,000
IFB038-14Annapolis Road Unit Ventilator ReplacementFebruary 21, 2014February 20, 2015Hot and Cold Corporation $643,650
IFB039-14Cool Springs ES Ice Storage Unit ReplacementFebruary 21, 2014February 20, 2015Hot & Cold $219,750
IFB041-14 Drew Freeman MS Ice Storage Unit (AC) ReplacementFebruary 21, 2014February 20, 2015Hot & Cold $356,675
IFB042-14Ice Storage&AC Unit Repl at Montpelier ESFebruary 21, 2014February 20, 2015Ice Storage & AC Unit Repl at Montpelier ES $207,650
IFB043-14 Third Party Inspection at Eugene Burroughs MSFebruary 21, 2014February 20, 2015Kim Engineering $124,917
IFB044-14Roof Top HVAC Unit Replacement at F. Douglass HSFebruary 21, 2014February 20, 2015RSC Electrical and Mechanical $1,381,000
IFB057-13Eugene Burroughs MS RenovationFebruary 21, 2014September 1, 2015Tuckman-Barbee $33,974,200
RFP002-14Teacher Leader Program EvaluationFebruary 1, 2014January 31, 2015Educ Info Resource Ctr (ERIC) $99,800
RFP020-13Oracle Identity Mgt February 1, 2014January 31, 2016Tech Democracy $199,600
IFB021-14Service & Repair Generators February 1, 2014January 31, 2017Potomac Generator $13,610.2
IFB012-14Furnish & Deliver Boys & Girls Athletic UniformsJanuary 9, 2014November 30, 2014BSN Sports $100,000
IFB012-14Furnish & Deliver Boys & Girls Athletic UniformsJanuary 9, 2014November 30, 2014Marlow Sports inc $100,000
IFB055-14 French Immersion Renovation at Old Greenbelt MS December 20, 2013June 30, 2015CDCI, Inc. $1,422,651
IFB048-14Increase Water Line Svc @ 2 PGCPS Bus LotsDecember 16, 2013November 16, 2014Rapp Contracting, Inc $79,550
IFB003-14ISSC Warehouse Roof ReplacementDecember 13, 2013December 12, 2014SGK Contracting $808,000
IFB013-14Athletic Fields Maintenance Service at Various MS & HSNovember 1, 2013October 31, 2014TruGreen LandCare. LLC $561,199.69
IFB013-14Athletic Fields Maintenance Service at Various MS & HSNovember 1, 2013October 31, 2015Community Bridge, Inc $246,072
RFP085-12Copier and Printer Mgmt SvcsNovember 1, 2013October 31, 2016RICOH USA, Inc $17,247,852.8
RFQ91827Annaplis Road MS Parking Lot RepairOctober 15, 2013 , CDCI $597,870
RFP011-14Develop and Implement Student Survey October 1, 2013June 30, 2015Panorama Education, LLC $168,250
RFQ91825Friendly HS Auditorium RenovationsSeptember 20, 2013 , CDCI, Inc $328,794.37
RFQ91830 Andrew Jackson Piping Insulation ReplacementSeptember 5, 2013 , Retro Environmental, Inc $251,990
RFP063-13Title 1 Non-Public Professional ServicesSeptember 1, 2013August 31, 2015Learn it Systems $101,668
IFB068-13Finance The Procurement & (SGB) Master Lease Agreement FY2014 September 1, 2013October 1, 2017Grant Capital Management $NaN
RFQ91759AE Svc for Buck Lodge Partial Roof ReplacementAugust 27, 2013 , WMCRP $78,810
RFQ91758A/E Service for Duval HS Window Wall Tech Fab ReplacementAugust 22, 2013July 22, 2014WMCRP $51,600
IFB026-13HVAC Parts & AccessoriesAugust 15, 2013June 30, 2015CAPP $25,000
IFB039-13Toner CartridgesAugust 1, 2013July 31, 2014City Supply Inc $330,932
IFB039-13Toner CartridgesAugust 1, 2013July 31, 2014CVR Computer Supplies $1,099,212.5
IFB039-13Toner Cartridges August 1, 2013July 31, 2014Laserlink International $330,932
IFB039-13Toner CartridgesAugust 1, 2013July 31, 2014Officemax $25,193.5
IFB040-13Automotive Fasteners August 1, 2013July 31, 2015Lawson Products $603,280.2
IFB060-13Lockers, Parts & ComponentsAugust 1, 2013July 31, 2016Steel Products $20,000
IFB060-13Lockers, Parts & Components August 1, 2013July 31, 2016WA Hamilton $20,000
RFQ91816HVAC Control System @ Bradbury HeightsJuly 25, 2013 , Hot & Cold Corp $59,420
IFB015-13Pod Renovations at Allenwood ESJuly 22, 2013July 31, 2014Beltsville Industries Group $1,806,416
IFB026-13HVAC Parts & AccessoriesJuly 1, 2013June 30, 2015Boland $25,000
IFB033-13Heating OilJuly 1, 2013June 30, 2015Papco, Inc. $500,000
RFP038-13038-13 Install and Repair of LANJuly 1, 2013June 30, 2016Lanier Electronics $50,000
RFP038-13038-13 Install and Repair of LANJuly 1, 2013June 30, 2016Technical Specialists $50,000
RFP056-13Lease Production PurchaseJuly 1, 2013June 30, 2015 Xerox Corporation $13,117.14
RFP067-12Payroll Debit CardJuly 1, 2013June 30, 2014WEX Inc.- Rapid PayCard $NaN
RFP078-12Framework for Teachers July 1, 2013June 30, 2015ASCD $439,998.02
IFB038-13E-Rate Installation and Repair of LAN July 1, 2013June 30, 2016Systems Application and Technologies $50,000
IFB033-13Heating OilJuly 1, 2013June 30, 2015Mansfield Oil Company $500,000
IFB026-13HVAC Parts & AccessoriesJuly 1, 2013June 30, 2014Aireco Supply Inc $25,000
IFB026-13HVAC Parts & AccessoriesJuly 1, 2013June 30, 2015Southern Utilities $25,000
RFQ91794Boiler Replacement @ James McHenryJune 26, 2013 , Hot & Cold Corporation $281,375
RFQ91795Boiler Replacement @ James McHenryJune 26, 2013 , Hot & Cold Corporation $281,375
IFB065-13Generators Replacement III at Various PGCPS LocationsJune 26, 2013 , Dvorak, LLC $117,177.88
RFQ91784Fire Alarm @ Allenwood ESJune 24, 2013 , Alarm Tech Solutions, LLC $82,550
RFQ91785Fire Alarm @ Arrowhead ESJune 24, 2013 , Alarm Tech Solutions, LLC $86,567.6
RFQ91786Fire Alarm @ Baden ESJune 24, 2013 , Alarm Tech Solutions, LLC $98,813
RFQ91787Fire Alarm @ Barnaby ManorJune 24, 2013 , Alarm Tech Solutions, LLC $98,813
RFQ91766Hallway Lockers at 3 PGCPS SchoolsJune 4, 2013June 3, 2014WA Hamilton $494,533.6
RFP041-13Autism Waiver CoordinationJune 1, 2013May 31, 2015The Arc Prince George's County $170,000
IFB051-13Horizontal Venetian BlindsJune 1, 2013June 30, 2015Diamond Interior Design $82,000
RFQ91761Kitchen Equipment at John Hanson French ImmersionMay 24, 2013May 23, 2014Rich Moe Enterprises $67,158
RFQ91762Gwynn Park HS Kitchen ProjectMay 24, 2013May 23, 2014Global Builders $134,000
IFB055-13Chiller Repl at Chapel Forge ECCMay 10, 2013 , Hot & Cold Inc $158,387
RFP050-13Professional Auditing ServicesMay 1, 2013April 30, 2017Bert Smith & Company $972,648
IFB054-13Friendly HS Cooling Towers (2) ReplacementMay 1, 2013April 30, 2014RSC Electrical $148,000
IFB042-13042-13 WSSC Grease Trap CorrectionsApril 26, 2013April 25, 2014Rich Moe Enterprises $168,000
IFB006-13University Park ES Pod (4) RenovationsApril 24, 2013July 1, 2014Tito Contractors $1,198,595
IFB023-13Admin Office Renovation & Vestibule Addition at Central HSApril 13, 2013October 1, 2014Nastos Construction Inc $937,000
IFB046-13WSSC Grease Trap Corrections at 3 PGCPS SchoolsApril 8, 2013April 8, 2014Rich Moe Enterprises $206,600
IFB035-13WSSC Grease Trap Corrections at 4 PGCPS SchoolsMarch 28, 2013April 1, 2014Rich Moe Enterprises $91,800
RFP032-13Reading and Enrichment Program for English Language LearnersMarch 1, 2013February 28, 2015WLC,LLC d/b/a Learning Together $124,238.08
IFB027-13Door and Cabinet Hardware February 1, 2013January 31, 2014Accredited Lock Supply $24,613.75
IFB027-13Door and Cabinet Hardware February 1, 2013January 31, 2015Colonial Lock Supply $5,418
IFB027-13Door and Cabinet HardwareFebruary 1, 2013January 31, 2014Electronic Access Specialist $5,649.3
IFB027-13Door and Cabinet HardwareFebruary 1, 2013January 31, 2014Independent Hardware $64,265.4
IFB027-13Door and Cabinet HardwareFebruary 1, 2013January 31, 2015Interline Brands, Inc $801.75
IFB029-13Copier PaperFebruary 1, 2013January 31, 2016TSRC dba Frank Parson $20,716.6
IFB029-13Copier PaperFebruary 1, 2013January 31, 2016Unisource Worldwide $708,265
IFB029-13Copier PaperFebruary 1, 2013January 31, 2016W B Mason $1,223,131.8
RFP009-13Mathematics Common Core January 1, 2013December 31, 2015Math Solutions div of Scholastic $937,110
RFP025-13Behavioral ConsultationJanuary 1, 2013December 31, 2015Community Counseling and Mentoring $283,500
IFB001-13Furnish and Deliver Dry FoodsSeptember 1, 2012August 31, 2014Eastern Food $2,256,762.8
IFB002-13Frozen and Refrigerated FoodsSeptember 1, 2012August 31, 2014Eastern Food $10,545,500.45
IFB004-13PU,Deliver and Recapping Tire ServiceSeptember 1, 2012August 31, 2015Mc Carthy Tire Service $26,320
IFB004-13Pick Up Deliver and Recapping TiresSeptember 1, 2012August 31, 2015Service Tire $26,320
IFB095-12Furnish and Deliver Bread and RollsSeptember 1, 2012August 31, 2015H and S Bakery $696,662
RFQ91752Bowie HS Ground FloorAugust 12, 2012September 1, 2013Global Builders LLC $77,055
IFB034-13E-Rate Wireless ServiceJuly 1, 2012June 30, 2016AT & T Mobility $172,000
IFB034-13E-Rate WirelessJuly 1, 2012June 30, 2016Verizon Wireless $172,000
IFB037-13VOIP for Local and LandJuly 1, 2012June 30, 2016ENA Services $2,640,000
RFP055-12E-Rate Internet Access ServiceJuly 1, 2012June 30, 2017Cogent Communications $173,000
RFP055-12E-Rate Internet Access ServiceJuly 1, 2012June 30, 2016Zayo Group formerly Fibergate, Inc. $142,000
RFP081-12Consulting Services Oracle ERPJuly 1, 2012June 30, 2015Bourntec $NaN
RFP081-12Consulting Services Oracle ERPJuly 1, 2012June 30, 2015EIS $NaN
RFP081-12Consulting Services Oracle ERPJuly 1, 2012June 30, 2015Matrice Consulting $NaN
RFP081-12Consulting Services Oracle ERPJuly 1, 2012June 30, 2015Senryo $NaN
RFP081-12Consulting Services Oracle ERPJuly 1, 2012June 30, 2015Signum Group $NaN
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Bilingual Therapies, Inc $200,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Cobb Pediatric Speech Svcs $560,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015EBS - Educational Based Svcs $1,600,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2013Excel Professional Staffing $100,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Invo Healthcare Associates $250,000
RFP087-12Speech Pathology,OT,PT, Infant Svcs July 1, 2012June 30, 2015Kaleidoscope Family $100,000
RFP087-12Speech Pathology,OT,PT, Infant Svcs July 1, 2012June 30, 2013Learn It Therapy Svcs, LLC $100,000
RFP087-12Speech Pathology,OT,PT, Infant Svcs July 1, 2012June 30, 2015Metropolitan Area Comm Svcs $325,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Progressus Therapy, LLC $500,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Soliant Health, Inc. $560,000
RFP087-12Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2013Sunbelt Staffing $100,000
RFP087-12 Speech Pathology,OT,PT, Infant SvcsJuly 1, 2012June 30, 2015Therapy Source, Inc. $100,000
RFP088-12Sign Language InterpreterJuly 1, 2012June 30, 2015Abacus-n-Bytes $45,000
RFP088-12Sign Language InterpreterJuly 1, 2012June 30, 2015Prof Interpreter Exchange $200,000
RFP044-12 Partnership for Principal PipelineMay 1, 2012April 30, 2015Bowie University $217,000
IFB036-12New Henry G. Ferguson ES ConstructionApril 11, 2012September 30, 2014Hess Construction $22,950,000
IFB038-12Hyattsville ES ConstructionApril 10, 2012September 30, 2014Sigal Construction $27,160,000
IFB020-12Large Kitchen EquipmentFebruary 1, 2012January 31, 2013American Energy Restaurant $31,500
IFB020-12Large Kitchen Equipment February 1, 2012January 31, 2015Ashland Equipment $416,009
IFB020-12Large Kitchen EquipmentFebruary 1, 2012January 31, 2013Calico Industries, Inc $75,642
RFP027-12Web Filtering SolutionFebruary 1, 2012January 31, 2013Datanetworks $185,200
IFB042-12 DOT Physical ExaminationsFebruary 1, 2012January 31, 2013Concentra Medical Centers $92,000
IFB045-12 Employee Drug TestingFebruary 1, 2012January 31, 2013Pembrooke Occupational Health $30,000
IFB060-11Refreshing the LAN Intrastructures April 1, 2011March 31, 2012Lanier Electronics $11,779,081.87