Facilities Administration
   Building (FAB) 
13300 Old Marlboro Pike, Room 13
Upper Marlboro, Maryland 20772
Office Number: 301-952-6500
Fax Number: 301-952-0346

Facilities Service Base (FSB) 
4801 Brown Station Road 
Upper Marlboro, Maryland 20772
Office Number: 301-952-7815
Fax Number: 301-952-6906

Last modified: 5/1/2013 8:27:58 AM
News

 Sixth Annual Snow Plow Mural Design & Artwork Contest - 2012


You have to see the pictures...

https://picasaweb.google.com/PGCPSphotos/2012SnowPlowMuralCompetition#


The results are in and we want to thank all of the 17 schools that participated in the Division of Supporting Services 2012 Snow Plow Mural Design & Artwork Contest.  This snow season the Grounds Shop will proudly display the painted snow plows on our trucks.

High School Winners

Dr. Henry A. Wise, Jr., High School  

 First Place
Northwestern High School  Second Place
 

Middle School Winners

Samuel Ogle Middle School First Place
William Wirt Middle School Second Place

______________________________________________________

Exterior Clock Installation Project at University Park ES

On December 21, 2009, members of the Prince George's County Public Schools (PGCPS) Maintenance Department installed a decorative four sided outdoor clock at University Park Elementary School.  This beautiful 15 foot clock, donated to the school by the Town of University Park was installed near the flag pole at the main entrance of the school.  The donation was facilitated by former town councilmember Lynn Dudinski.  The clock was manufactured by the Fancy Clock Company and weighs 345 lbs.  

Children from the school squealed with delight as the clock was unwrapped and lowered into place by the large boom truck provided by PGCPS Electrical Shop.  Ariving just before the winter break; the clock was a wonderful present for the school and a source of pride for the Town of University Park. 

Special thanks to Garrie Shope, PGCPS Electrical Planner and all the men from the Electrical Shop; additional thanks to Terry Brown, Master Foreman of the Grounds Shop and his workers who installed the foundation of the clock.             

 

 undefined

 undefined

                         

_________________________________________________________

Flooring Replacement Project in POD at Oxon Hill ES 

PGCPS Department of Maintenance performed a flooring replacement project in the pod areas of Oxon Hill ES.  This flooring project consisted of replacing aging carpet with new vinyl composition floor tile throughout the pod areas.  This project was funded through the Quality Zone Academy Bonds Program. 

             

   undefined

        undefined  

Work In Progress
Before Picture

 

Flooring Completed
After Picture

                         
__________________________________________________

Chimney Replacement Project at Oxon Hill Middle School

The Chimney Replacement Project at Oxon Hill Middle School consisted of refurbishing a deteriorating chimney.  

In order to completely demolish the chimney, the existing roof had to be protected.  A scaffold was then erected to access work areas.  The equipment on the ground included rough terrain fork lift, mortar mixer and disposal dumpster. 

This project significantly enhanced the safety of the boiler operation at this school. 

                                     

 

 

                     

Before Pictures

 

After Pictures


Window and A/C Replacement Project at Judith P. Hoyer ECC

The Window and Air Condition (A/C) Replacement Project at Judith P. Hoyer Family Learning Center (FLC) in Adelphi, MD, consisted of replacing aging wooden windows and A/C units with new window A/C units installed in fixed glazing panels, along with insulated glass. Old wooden windows that remained were refurbished.

  

undefined

                   After Picture A

Before Pictures

 

After Pictures

undefined   undefined

 

 

________________________________________________________________________________